Sold
Last Sold Price
21,780 Lot Size0.5 Acres
16562 Gantt Lake Road, Dozier, AL 36028
LandProperty Type
0.5 acresLot Size

Description

Gantt Lake Waterfront lot located at 16562 Gantt Lake Road Dozier, AL near the head of the lake and Highway 29. Features: approx. 134' of waterfront, boathouse/pier, seawall, level lot, power and water onsite, electric at boathouse, fishing and boating. The boat house has two spaces for boats and a lift. Camper is included.Gantt Lake Waterfront lot located at 16562 Gantt Lake Road Dozier, AL near the head of the lake and Highway 29. Features: approx. 134' of waterfront, boathouse/pier, seawall, level lot, power and water onsite, electric at boathouse, fishing and boating. The boat house has two spaces for boats and a lift. Camper is included.
  • Listed by: Brannon Harrison 334.493.0129 brannonharrison@yahoo.com • Covington Realty, LLC
Listing closed: 06/14/2023 12:00 AM • Source: Covington AOR, MLS#: 22309

See It First™ on Compass

Find homes before they're listed on other real estate sites.

Start your search

Location

Listing Courtesy of Covington Realty, LLC

Sold By OUTLAW REALTY

Add your commute

Payment Calculator

$781 per month

30 year fixed, 7.03% Interest

Principal and Interest

$721

Property Taxes

$61

HOA Dues

$0

The Payment Calculator is for illustrative purposes only.

Know your buying power with a preapproval and custom rate in minutes

Rocket Mortgage1

Property Information for 16562 Gantt Lake Road

Property Details
  • Taxes: $726 / year
  • MLS Type: Land
  • Waterfront Features: Lake Front
  • Has Waterfront: Yes
Building Information
  • Lot Size: 0.50 AC
Summary
Location and General Information
  • Directions: Beginning at the intersection of County Rd 77 in Dozier and Highway 29 in Dozier, travel South on Highway 29 approx. 4.4 miles to Sims Road. Turn left onto Sims Road and continue following road. Sims Road will turn into Gantt Lake Road when it curves to the right. Property will be on the left.
  • Latitude: 31.453404
  • Longitude: -86.429675
  • MLS Area Major: Gantt Lake Waterfront
Taxes and HOA
  • Parcel Number: 230307350001014.001
  • Tax Annual Amount: $726.00
Property
Lot Information
  • Lot Features: Level
  • Lot Size Acres: 0.5
  • Lot Size Dimensions: 100 x 133 x 54 x 134 x 290
  • Public Survey Range: 16E
  • Public Survey Section: 35
  • Public Survey Township: 06N
  • Topography: Level, Partially Wooded, Exceptional View
Property and Assessments
  • Current Use: Unimproved
  • Property Type: Land
Building Features
  • Other Structures: Boat House

Property History for 16562 Gantt Lake Road

DateEvent & SourcePriceAppreciation
Jun 14, 2023

Sold

Covington AOR #22309

$135,000—
Jun 13, 2023

Sold (Public Record)

Public Record #1513424250

$135,000—
May 25, 2022

Listed (Active)

Covington AOR #22309

$185,000—
DateEvent & SourcePrice
06/14/2023

Sold

Covington AOR #22309

$135,000
06/13/2023

Sold (Public Record)

Public Record #1513424250

$135,000
05/25/2022

Listed (Active)

Covington AOR #22309

$185,000

For completeness, we often displays two records for one sale: the MLS record and the public record.

Public Records for 16562 Gantt Lake Road

Taxable ValueLand$30,800Additions$7,000Total$37,800
Tax Record2025$892 ($74 / month)
Home Facts
Baths1Total Finished SqFt1,279 SqFtAbove Grade Finished SqFt1,279 SqFtLot Size21,026 SqFtStyleMiscellaneousYear Built1998Year Renovated1998CountyCOVINGTONAPN23-03-07-35-0-001-014.001

Schools near 16562 Gantt Lake Road

This home is within Covington County School District.
Rating
School
Type
Grades
Distance
Public - PK to 5
Public - 6 to 8
Public - 9 to 12
Public - 7 to 12
Rating
School
Distance
Straughn Elementary School
PublicPK to 5

Straughn Middle School
Public6 to 8

Straughn High School
Public9 to 12

Red Level High School
Public7 to 12

School ratings and boundaries are provided by GreatSchools.org and Pitney Bowes. This information should only be used as a reference. Proximity or boundaries shown here are not a guarantee of enrollment. Please reach out to schools directly to verify all information and enrollment eligibility.

Similar Homes

No guarantee, warranty or representation of any kind is made regarding the completeness or accuracy of any information, descriptions or measurements (including square footage measurements and property condition), such should be independently verified through appropriate means, including, but not limited to, in person inspection and public records, and Compass International Holdings, its subsidiaries, affiliates and independently owned and operated franchisees, and their affiliated agents and associated third parties expressly disclaim any liability in connection therewith. Photos may be virtually staged or digitally enhanced and may not reflect actual property conditions. Offers of compensation are subject to change at the seller's discretion. No financial or legal advice provided. Equal Housing Opportunity. Subject to change at any time. Compass, Inc., its subsidiaries, affiliates and their agents and associated third parties make no guarantee, warranty or representation regarding the accuracy of any waterfront feature, water view or waterfront view.

Listing Courtesy of Covington Realty, LLC

The information being provided by Covington Association of Realtors is for the consumer's personal, non-commercial use and may not be used for any purpose other than to identify prospective properties consumers may be interested in purchasing. The information is deemed reliable but not guaranteed and should therefore be independently verified. ©2026 Covington Association of Realtors All rights reserved.