6465 Corina's Curv

1,623 Sq. Ft.
$200 / Sq. Ft.
1,623
Sq. Ft.
$200
per Sq. Ft.

Description

This beautifully maintained 3-bedroom, 2-full-bath ranch offers the perfect blend of comfort, privacy, and convenience. Featuring a striking brick and vinyl exterior and a professionally landscaped yard, this home welcomes you with immediate curb appeal. Inside, is a great room with cathedral ceilings and fireplace which creates an open, comfortable space. The primary bedroom features a large walk-in closet and a private ensuite bath. The kitchen boasts a generous eating area and flows seamlessly...This beautifully maintained 3-bedroom, 2-full-bath ranch offers the perfect blend of comfort, privacy, and convenience. Featuring a striking brick and vinyl exterior and a professionally landscaped yard, this home welcomes you with immediate curb appeal. Inside, is a great room with cathedral ceilings and fireplace which creates an open, comfortable space. The primary bedroom features a large walk-in closet and a private ensuite bath. The kitchen boasts a generous eating area and flows seamlessly outdoors to a large tiled patio overlooking the yard and peaceful open space beyond. Nestled in a quiet, secluded neighborhood, this home offers the best of both worlds: country-like tranquility with easy access to amenities. You're just 5 minutes from the scenic Rock River and 10 minutes from Roscoe, putting shopping, dining, parks, and schools all within easy reach. Nothing to do but move in and enjoy this spectacular home! Home Warranty included & new roof in 2023.
  1. Listed by Rebecca LeClaire • Century 21 Affiliated - Rockford
    P: (815)-721-1894 midwesthomesales@gmail.com

Property Details for 6465 Corina's Curve

Area
Rockford
Township
Rockford
Ownership
Fee Simple
Num Of Garage Spaces
2.0
Num Of Parking Spaces
2.0
Air Conditioning Type
Central Air
Num of Interior Fireplaces
1
Heat/Fuel
Natural Gas, Forced Air
LISTING UPDATED: 04/26/2026 12:26 PM

Property Details for 6465 Corina's Curve

StatusContingent
MLS #12623919
Days on Market7
Taxes$2,608 / year
HOA Fees-
Condo/Co-op Fees-
Property TypeSingle Family
MLS TypeHouse / 1 Story
Year Built2001
Lot Size0.31 AC / 13,503 SF
CountyWinnebago County

Location

Listing Courtesy of Century 21 Affiliated - Rockford
Add your commute

Building Information for 6465 Corina's Curve

Stories-Year Built2001Building Size-Lot Size0.31 AC / 13,503 SF

Payment Calculator

Get preapproved with
OriginPoint Mortgage or Rocket Mortgage1

$1,854 per month

30 year fixed, 6.46% Interest

Principal and Interest

$1,637

Property Taxes

$217

HOA Dues

$0

The Payment Calculator is for illustrative purposes only.

Know your buying power with a preapproval and custom rate in minutes

Rocket Mortgage1

Property Information for 6465 Corina's Curve

General Information
School Information
  • Elementary School District: 205
  • Elementary School: West View Elementary School
  • Jr High Middle School: West Middle School
  • High School District: 205
  • High School: Auburn High School
  • Middle Or Junior School District: 205
Addtl Parking Information
  • Parking Details: Asphalt, Garage Door Opener, Yes, Garage Owned, Attached, Garage
Taxes and HOA Information
  • Association Fee Frequency: Not Applicable
  • Association Fee Includes: None
  • Master Association Fee Frequency: Not Required
Property Information
Interior Features
  • Interior Property Features: Cathedral Ceiling(s), 1st Floor Bedroom, 1st Floor Full Bath, Walk-In Closet(s)
  • Num Of Rooms: 6
  • Bedrooms Total: 3
  • Bedrooms (Below Grade): 0
  • Community Features: Sidewalks, Street Paved
  • Fireplace Features: Gas Starter
  • Basement Type: Unfinished, Full
  • Bedrooms Possible: 3
  • Air Conditioning: Central Air
  • Electric: Circuit Breaker
  • Basement Bathrooms: No
  • Room Type: Other Room
  • Num of Baths: 2.0
Exterior Features
  • Patio And Porch Features: Patio
  • Type: 1 Story
Utilities / Equipment
  • Sewer: Sewer-Public
  • Water: Public
  • Appliances: Range, Microwave, Dishwasher, Refrigerator, Washer, Dryer
  • Other Equipment: Security System
Property/Lot Information
  • Exterior Property Features: Other
  • New Construction YN: No
  • Rebuilt: No
  • Rehabilitated: No
  • Built Before 1978: No
  • Age: 21-25 Years
  • Type Detached: 1 Story
  • Total Sq Ft: 1623
  • Aprox Total Finished Sq Ft: 1623
  • Total Finished and Unfin Sq Ft: 1623
  • Lower Sq Ft: 0
  • Main Sq Ft: 1623
  • Lot Size: .25-.49 Acre
  • Lot Size Source: County Records
  • Lot Dimensions: 13617
  • Waterfront: No
  • Disability Access and/or Equipped: No
  • Exterior Building Type: Vinyl Siding, Brick, Stone
  • Construction: Vinyl Siding, Brick, Stone
  • Roof Type: Asphalt
  • General Information: None
  • Living Area Source: Assessor
Property and Assessments
  • Public Document Count: 1
  • Document Date: 2026-04-20T16:23:20
  • Photos Count: 48
  • OpenHouse Count: 0
Virtual Tour/Additional Media
  • Virtual Tour: None
  • Virtual Tour YN: No
Room Information
Master Bedroom Information
  • Master Bedroom Level: Main
  • Room Type: Master Bedroom
  • Master Bedroom Bath: Full
  • Master Bedroom Dimensions: 15X12
Bedroom #2 Information
  • 2nd Bedroom Level: Main
  • Room Type: Bedroom 2
  • Bedroom #2 Room Dimensions: 15X10
Bedroom #3 Information
  • 3rd Bedroom Level: Main
  • Room Type: Bedroom 3
  • Bedroom #3 Room Dimensions: 12X10
Bedroom #4 Information
  • 4th Bedroom Level: N/A
  • Room Type: Bedroom 4
Dining Room Information
  • Dining Room Level: Main
  • RoomType_DR: Dining Room
  • Dining Room Dimensions: 12X10
Family Room Information
  • Family Room Level: Main
  • RoomType_FR: Family Room
  • Family Room Dimensions: 21X14
Kitchen Information
  • Kitchen Level: Main
  • RoomType_KT: Kitchen
  • Kitchen Dimensions: 11X24
Laundry Information
  • Laundry Level: Main
  • Room Type: Laundry
  • Laundry Dimensions: 7X6
Living Room Information
  • Living Room Level: N/A
  • Room Type: Living Room
Other Room Information
  • Room Level: Main
  • Room Type: Other Room
  • Dimensions: 28X14

Property History for 6465 Corina's Curve

DateEvent & SourcePriceAppreciation
Apr 21, 2026

Contingent

MRED #12623919

Apr 20, 2026

Pending

NorthWest Illinois Alliance of REALTORS® #202602150

Apr 20, 2026

Listed (Active)

MRED #12623919

$325,000
DateEvent & SourcePrice
04/21/2026

Contingent

MRED #12623919

04/20/2026

Pending

NorthWest Illinois Alliance of REALTORS® #202602150

04/20/2026

Listed (Active)

MRED #12623919

$325,000

For completeness, Compass often displays two records for one sale: the MLS record and the public record.

Public Records for 6465 Corina's Curve

Taxable ValueLand$18,748Additions$56,351Total$75,099
Tax Record2024$4,646 ($387 / month)
Home Facts
Beds0Lot Size13,504 SqFtStyleSingle Family ResidenceCountyWINNEBAGOAPN07-24-376-006

Schools near 6465 Corina's Curve

This home is within Rockford School District 205.
Rating
School
Type
Grades
Distance
Public - K to 5
Public - 6 to 8
Public - 9 to 12
Public - 1 to 4
Rating
School
Distance
West View Elementary School
PublicK to 5

West Middle School
Public6 to 8

Auburn High School
Public9 to 12

Thurgood Marshall Elementary
Public1 to 4

School ratings and boundaries are provided by GreatSchools.org and Pitney Bowes. This information should only be used as a reference. Proximity or boundaries shown here are not a guarantee of enrollment. Please reach out to schools directly to verify all information and enrollment eligibility.

Similar Homes

Similar Sold Homes

No guarantee, warranty or representation of any kind is made regarding the completeness or accuracy of descriptions or measurements (including square footage measurements and property condition), such should be independently verified, and Compass, Inc., its subsidiaries, affiliates and their agents and associated third parties expressly disclaims any liability in connection therewith. Photos may be virtually staged or digitally enhanced and may not reflect actual property conditions. Offers of compensation are subject to change at the discretion of the seller. No financial or legal advice provided. Equal Housing Opportunity.

Listing Courtesy of Century 21 Affiliated - Rockford

Based on information from one of the following Multiple Listing Services: Midwest Real Estate Data LLC (\"MRED\"), MRED PLN GRID, Northwest Indiana REALTORS® Association and NorthWest Illinois Alliance of REALTORS. Information being provided is for the visitor’s personal, noncommercial use and may not be used for any purpose other than to identify prospective properties visitor may be interested in purchasing. The data contained herein is copyrighted by Midwest Real Estate Data LLC (\"MRED\"), MRED PLN GRID, Northwest Indiana REALTORS® Association and NorthWest Illinois Alliance of REALTORS is protected by all applicable copyright laws. Any dissemination of this information is in violation of copyright laws and is strictly prohibited. Property information referenced on this web site comes from the Internet Data Exchange (IDX) program of the MLS. This web site may reference real estate listing(s) held by a brokerage firm other than the broker and/or agent who owns this web site. For the avoidance of doubt, the accuracy of all information, regardless of source, is deemed reliable but not guaranteed and should be personally verified through personal inspection by and/or with the appropriate professionals. Properties displayed may be listed or sold by various participants in the MLS. Based on information submitted to the MLS GRID as of 04/26/2026 12:26 PM. All data is obtained from various sources and may not have been verified by broker or MLS GRID. Supplied Open House Information is subject to change without notice. All information should be independently reviewed and verified for accuracy. Properties may or may not be listed by the office/agent presenting the information.